国产精品久久久久免费视频_天天综合网天天综合色不卡_国产精品一区久久久_色爱区综合激月婷婷激情五月_免费在线观看a级片_免费无码AV色情在线

Conveyor switch

Bidirectional pull switch

The bidirectional pull switch is a bidirectional action, and pull ropes can be installed on both sides of the switch. When the belt conveyor equipment malfunctions, on-site workers pull the ropes on both sides of the bidirectional pull rope switch, causing the cam inside the switch to press the micro switch and put the switch into working mode, issuing a shutdown signal to prevent and control the equipment and personnel.

  • HFKLT2-II
  • ZHUOXIN
  • 24V-380V
  • IP67
  • TT, PayPal, Credit card, Western union
  • +86-15163766288
  • The bidirectional pull switch is widely used in various fields such as metallurgy, coal, cement building materials, mining, power, ports, metallurgy, chemical engineering, etc., including conventional belt conveyors, underground cable support belt conveyors, ship loading and unloading systems, stacking/reclaiming conveyors, inclined and shuttle conveyors, cranes, excavators, boom limiters, skirt feeders, and other types of conveyors.

Description

Conveyor switch







Bidirectional pull switch HFKLT2-II

The bidirectional pull wire switch HFKLT2-II is a protective switch that achieves emergency shutdown of the system in the event of an accident during the operation of a tape conveyor, protecting personnel or equipment< Br/>
1、 Overview
The bidirectional pull switch HFKLT2-II (i.e. pull rope switch, emergency stop switch) adopts an integral seal, which has the characteristics of waterproof, moisture-proof, dustproof, etc., and is suitable for use in harsh indoor and outdoor environments with high humidity and dust< Br/>




2、 Main use

This series of products is a protective switch for emergency shutdown of the system in case of accidents during the operation of tape conveyors, protecting personnel or equipment< Br/>
3、 Main technical indicators
Working voltage& Nbsp& Nbsp; AC220V

Action angle& Nbsp& Nbsp; 25< Br/>
Contact capacity& Nbsp& Nbsp; AC220V; 3A

Extreme angle& Nbsp& Nbsp; 75< Br/>
Contact form& Nbsp& Nbsp; Double breakpoint 1 normally open and 1 normally closed

Protection level& Nbsp& Nbsp; IP65

Service life& Nbsp& Nbsp; 100000 times

Re & Nbsp; Quantity& Nbsp& Nbsp; 2.5Kg





4、 External structure and working principle

1. Appearance structure

2. Working principle

This product is a bidirectional action, and pull ropes can be installed on both sides of the switch. When the belt conveyor equipment malfunctions, on-site workers pull the ropes on both sides of the bidirectional pull rope switch, causing the cam inside the switch to press the micro switch and put the switch into working mode, issuing a shutdown signal to prevent and control the equipment and personnel< Br/>




5、 Installation and wiring
(1)   Installation
Users can create a self-made installation bracket based on the installation dimensions indicated by the external structure, or they can order it from our company. Fix the switches on both sides of the tape machine, install them in pairs, and meet the following requirements:

1.  During installation, the product should be positioned below the tape (its height should be convenient for on-site personnel to use) and fixed on both sides of the tape conveyor along the line. The distance between each pull rope switch should be around 40 meters< Br/>
2.  Tie the pull rope to the swing arm of the switch body, fix it with a rope clip, and first install support rings on both sides of the switch nearby. Then install support rings every 3 meters to avoid excessive deflection and ensure the normal use of the switch< Br/>
3.  Under the premise of ensuring normal operation of the switch, try to tighten the ropes on both sides as much as possible and minimize the vertical deflection of the rope< Br/>
4.  For slope tape machines, the length of the pulling rope and the switching distance should be shortened as appropriate< Br/>
(1)   Wiring
Lead out a four core rubber sleeve cable at the outlet, which is red, blue, yellow, and black. Among them, red and blue are the outgoing lines of the dynamic break point. Yellow and black represent the outgoing lines of the dynamic closing contact. The wiring principle is shown in Figure (4)

6、 Maintenance and upkeep
1.  Regular dust removal, regular inspection of switch contact conversion status to ensure normal operation< Br/>
2.  If the machinery or steel wire rope is severely rusted, it should be replaced in a timely manner< Br/>


&Nbsp;

Tags

Get the latest price? We'll respond as soon as possible(within 12 hours)
主站蜘蛛池模板: 天天色av | 中文字幕日韩欧美 | 成人在线激情网 | 亚洲国产精品久久综合 | 黄视频免费在线 | 精品午夜寂寞影院在线观看 | 日韩三级中文 | www.成人.com| 国产午夜精品久久久久小说 | 一级片在线视频 | 久久99久久99精品免观看不卡 | 久久久噜噜噜久久中文字幕色伊伊 | 欧美成人免费高清二区三区 | 免费视频精品一区二区 | 久久精品国产99国产精品 | 精品国产一区二区国模嫣然 | 国产精品国产三级国产aⅴ原创 | 国产高清在线观看av | 欧美理伦视频 | 99国产精品2018视频全部 | 色婷婷久久久久swag精品 | 日本大片在线免费观看 | 久草看片 | 九九导航 | 国产精品久久人妻无码网站蜜臀 | 免费区一级欧美毛片 | 国内精品久久毛片一区二区 | 午夜欧美性欧美 | 国产一级毛片视频 | 日韩午夜激情视频 | 俄罗斯hdxxx 亚洲欧美视频在线播放 | 日本精品久久久久中文字幕2 | 久久一日本道色综合久久m 亚洲三级视频 | 国产精品原创巨作av | 草草影院浮力 | 爱爱视频在线观看 | 午夜免费福利视频 | 新封神榜杨戬电影免费动画在线观看国语 | 日本亚洲一区 | 久草在线新免久费观看视频 | 国产 日韩 欧美 在线 |